The First Twin Towers of The Country
Elegantly Designed Double-height Atrium and Reception
08 Destination Passenger Elevators (17 Person Capacity) of Schindler Advanced Port Technology, Ensuring Optimized Energy Efficiency and Minimum Wait Time, and 02 Service Elevators
Central HVAC System With Load Management
Full Load Power Backup with Most Advanced Generator
12’ Clear Height from Floor to Ceiling
Artsy Cafe/ Coffee Shop
Efficiently Designed Floor Space Providing Maximum Flexibility for Interior Design
Wide Open Plaza at Ground Floor (200’ Open at Front and 175’ Open at the Back)
Insulated Double-glazed, Low-E, Heat Resistant Glass in Fully Unitized Curtain Wall System for Energy Efficiency, Durability, Dust and Waterproofing
Professionally Designed Landscaping and Building Lighting (Using Only Energy-efficient Led Lighting)
State-of-the-art Firefighting and Smoke Detection System
Electro-mechanical Engineering Design By EEC Lincolne Scott Co.
Bas (Building Automation System) for Complete Monitoring, Safe and Efficient Facility Management
Three-layer Basement Parking with Mechanical Ventilation System
Common Area Finishing with Exclusive Materials & Fittings
Management Office, Fire Command Room and Drivers Waiting Rooms with Washrooms
Fire Stairs with 2-Hour Ul Certified Fire-resistant Doors
Central CCTV Monitoring & PA Systems
Ten Years Building Facilities Management Services by Shanta Holdings Limited
Explore